Our Work
Projects
Sun Streams 2 Solar Project 200 MWdc Solar Success
Sun Streams 2 Solar Project is a 200 MWdc utility-scale solar development in Maricopa County, Arizona, associated with Longroad Energy and placed into commercial operation in 2021. This project uses the trunk bus and IPC EBOS products as part of its installation-efficient electrical system design, supporting long-term solar performance.
200 MW
Jan 2021
Maricopa County, Arizona
Willow Springs Solar Project 100 MW Solar Success
Willow Springs Solar Project is a 100 MW utility-scale solar development in Kern County, California, associated with D. E. Shaw Renewable Investments (DESRI) and completed in December 2018. Developed by First Solar, the project reflects the scale, planning, and electrical coordination required for large photovoltaic infrastructure. This project uses installation-efficient EBOS design principles to support dependable long-term solar performance.
100 MW
Dec 2018
Kern County, California
North Rosamond Solar Project 150 MW Solar Success
North Rosamond Solar Project is a 150 MW utility-scale solar development in Kern County, California, associated with Duke Energy Renewables and completed in June 2019. Developed by First Solar, the project reflects the scale, planning, and electrical coordination required for large photovoltaic infrastructure. This project uses installation-efficient EBOS design principles to support dependable long-term solar performance.
150 MW
Jun 2019
Rosamond, CA
Phoebe Solar Project 250 MWac Solar Success
Phoebe Solar Project is a 250 MWac utility-scale solar development in Winkler County, Texas, associated with Innergex and commissioned in November 2019. The project uses First Solar Series 6 thin film photovoltaic modules and reflects the scale, planning, and electrical coordination required for large photovoltaic infrastructure. This project uses installation-efficient EBOS design principles to support dependable long-term solar performance.
250 MW
Jan 2019
Kermit, Texas
Moapa Southern Paiute Solar Project: Powerful 250 MWac Solar Success
Moapa Southern Paiute Solar Project is a 250 MWac utility-scale solar development in Clark County, Nevada, commissioned on March 17, 2017. Developed by First Solar, the project reflects the scale, planning, and electrical coordination required for large photovoltaic infrastructure. This project uses installation-efficient EBOS design principles to support dependable long-term solar performance.
250 MW
Mar 2017
Clark County, Nevada
California Flats Solar Farm 280 MWac Solar Success
California Flats Solar Farm is a 280 MWac utility-scale solar project completed in April 2019 in Monterey County, California. Developed by First Solar, the project reflects the scale, planning, and electrical coordination required for large photovoltaic infrastructure. This project uses installation-efficient EBOS design principles to support dependable long-term solar performance.
280 MW
Apr 2019
San Miguel, CA